:Budget clerk annual work report PPT template-PPT tutorial免费ppt模版下载-道格办公

Budget clerk annual work report PPT template

After years of work experience, I have the following summary and experience of my work. First of all, as a budgeter, I always adhere to the principles of integrity and professionalism. In my work, I always adhere to the attitude of excellence and strive t

Time flies, time flies. Unconsciously, I have spent more than four years at work, which has been busy and fulfilling. Over the past four years, I have gained a deeper understanding of cost work through continuous learning and practice. Now, I will make a summary of the work from 20xx to 20xx. As budgeters, we need to have the ability to recognize and read pictures, and master certain professional knowledge. Professional knowledge includes not only familiarity with quotas, but also knowledge of construction specifications, standard atlases, construction techniques, etc. For example, details such as hooks, overlaps and anchorage lengths of steel bars need to be determined according to specific specification requirements. In frame projects, the amount of hooks, overlaps and anchoring steel bars accounts for about 5% to 10% of the total steel bars. Therefore, it is crucial for estimators to master construction specifications and standard atlases. The following is a summary of my steps in budget work: 1. After receiving the complete drawings, first check whether the number of drawings matches the catalog, then read the drawings carefully to understand the project structure, understand the design intention, form the basic three-dimensional structure of the project, and do Make appropriate drawing records. 2. Collect required specifications and standard atlases, and become familiar with their contents. At the same time, study the construction organization design of the project and understand the construction deployment, construction flow and personnel arrangements. 3. Select the applicable quota and supporting withdrawal documents, as well as relevant adjustment information. Conduct market inquiries for unclear cost information or special materials and equipment. 4. Calculate the project quantity in strict accordance with the calculation rules of the selected project quota. Before calculating, you must be familiar with the calculation rules of the quota. I usually do quantity calculations in construction order, which helps keep a clear idea and clear process. 5. When applying quota sub-items, ensure that the work content is consistent with the construction drawings, specifications and standard atlases. For the application of special projects such as scaffolding, a deep understanding of the essence of the quota is required. 6. The fixed-amount fee shall be determined based on the project category and the area where the construction site is located. Be sure to specify the type of work and the specific location of the construction site to ensure accurate rates. 7. Material price adjustments should be based on the project material cost information released by the cost management agency of the city where the construction is located. 8. Preparation instructions, including the basis for preparation, the quotas and charging standards adopted, the number of periods of cost information, and the budget preparation software used, etc. 9. Bind the budget documents into a book, and have the relevant personnel stamp the professional qualification seal and sign for confirmation. With these steps, a complete budget can be prepared. These are my work experiences. Looking back on the work of the past four years, I realize that I still have many shortcomings that need to be continuously overcome in future work. I will continue to study the use of quotas and related documents in depth, improve my professional knowledge and work ability, enhance my sense of work responsibility, and complete various personal tasks in a timely manner. Looking forward to the future, I will continue to sum up my experience, reflect on my shortcomings, motivate myself to make continuous progress, improve my own quality and professional level, adapt to the development of the times and the company, and grow and progress with the company.

Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/yu-suan-yuan-nian-du-gong-zuo-hui-bao-PPT-mu-ban.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion