Construction progress network diagram:Project construction progress plan preparation and network plan drawing tutorial (Part 1)-Font Tutorial免费ppt模版下载-道格办公

Project construction progress plan preparation and network plan drawing tutorial (Part 1)

Engineering construction progress control refers to the implementation of progress control over the entire process of engineering construction projects, including planning, supervision, inspection, coordination and information feedback, etc., to ensure that the project is completed and delivered within the scheduled time limit. Since the work content and requirements at each stage of project construction are different, the stage goals of progress control are also different.

Generally speaking, in the early stage of construction, a reasonable and achievable short construction period is studied and planned; in the design stage, in addition to making specific arrangements for the sequence and progress of construction, the design work must also be controlled itself; however, the focus of progress control is on the construction stage. There are many factors related to construction progress control, such as technical reasons, organizational coordination reasons, climatic reasons, political reasons, financial reasons, manpower reasons, material reasons, construction site conditions, etc. Precisely because of the existence of these influencing factors, they will interfere with the achievement of progress goals, so we must do our best to control them.

However, the preparation of schedule plans and the drawing of network diagrams are particularly important when performing schedule management. In order to improve oneself in the future when taking the construction engineer examination, network diagrams often occupy a large value as a basic skill. Below we Focus on the preparation of schedule plans and the drawing of network diagrams.

See the end of the article for how to get the full version of the textbook

The following steps are required to obtain the information:

1. Like

2. Pay attention

3.Forward

4. Private message the editor with 2 words of progress to receive the full version of the tutorial

5. Organizing information is not easy, don’t skip the above steps

Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/gong-cheng-shi-gong-jin-du-ji-hua-bian-zhi-ji-wang-luo-ji-hua-tu-hui-zhi-jiao-cheng-shang.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion