In the month of XXXX, I was transferred to the laboratory of the first resident office in the west section of XX Highway as a test and testing engineer. The principle of "meticulous" has successfully completed the supervision test work of this year, and the supervision work of this year is reported as follows:
1. Since the resident office entered the site, according to the needs of this project and the requirements of the contract conditions, it has actively purchased test equipment and instruments, carried out installation, commissioning, and calibration, applied for temporary qualifications for the construction site, and continuously improved the test implementation rules and supervision regulations. , Various charts are put on the wall, and have been checked and accepted by the provincial quality inspection station, and have the test conditions for the construction preparation stage. While building the resident laboratory, supervise and inspect whether the contractor's entry test personnel and equipment meet the construction and contract requirements and the progress of various tasks, and require the contractor to establish a sound quality self-inspection system to lay the foundation for a smooth start.
2. Before starting construction, firstly, according to the design drawings and specification requirements, carry out standard and verification tests on the standard compaction of various raw materials, concrete mix ratios, soil and lime soil proposed by the contractor, so that all indicators meet the construction specifications and design drawings Requirements, provide reliable and accurate test basis for comprehensive construction.
3. Material quality control is the key point of our test supervision quality control. The prerequisite for qualified products is to have qualified raw materials. This is my most personal experience in road construction. The verification of specifications and date of manufacture, the contractor's self-inspection and supervisory sampling control, the investigation and retesting of suspicious materials are the main contents of our daily material quality control work, and reject unqualified materials from entering the construction site.
4. Construction process control. Before the start of each sub-project or individual project, the supervision and testing personnel shall inspect and confirm the concrete mix ratio before construction. During the construction process, observe the workability of the concrete at any time, and always keep it within the design requirements. Within the scope, to ensure the inherent quality of the concrete, the contractor and the supervisor make representative concrete test pieces at the same time, as one of the quality control indicators of the project.
XXX is about to pass. Looking back on the supervision work in the past six months, the deepest experience is that to do a good job in supervision work, you must be strict and serious, and have a strong sense of responsibility. No matter how complicated the project is, as long as the supervisors can meticulously follow the construction specifications and procedures By performing their duties, they can fully grasp the dynamics of the entire project and control the quality of the entire project. At the same time, with high professional quality, the supervisors can give each process and link a reminder in advance, and prevent possible quality problems. Elimination in the bud and precautions in advance of links that may cause quality hazards are of great help to our supervision work and will definitely promote our work.
Although we have been working hard to do every job in a solid manner, there are still deficiencies. The phenomenon of poor control and supervision in the field and confusion in filling in the data in the field occur from time to time. According to the existing problems, we are reminded to continue to study the construction specifications, test According to the regulations, be familiar with the design drawings, improve the business level and self-quality, strengthen the supervision, increase the frequency of sampling inspection, keep abreast of the construction dynamics, and control the construction quality.
With the strong support of the XX Highway Project Office and the Director's Office and the active cooperation of the contractor, we will continue to do a good job in the supervision and testing work in 20xx. This requires each of our test personnel to control in advance, eliminate post-processing, have a serious and responsible work attitude, have a strong sense of responsibility, be fully familiar with and master business knowledge and skills, make up for past deficiencies, and strictly control engineering materials. The entrance quality check and the construction site quality inspection check are to be the patron saint of the project quality, and to establish a good corporate image for Hualujie Highway Engineering Technology Consulting Co., Ltd. in the construction of the west.
Work summaryRecommended ppt template:
Cartoon Chinese Year of the Ox work summary report ppt template
Chinese style financial work summary general ppt template
Business concise and creative department annual work summary ppt template
Sales department annual work summary and new year plan ppt template
2021 small fresh year-end work summary ppt template
Black simple Education and teaching work summary report ppt template
Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/Test%20engineer%20work%20summary%20ppt%20sample.html
评论列表(196条)
测试