Knowing one's own shortcomings and development direction is a very important link of work summary. Next, I will share with you my work summary PPT sample. Page 1: Title: 2021 Supervision Engineer Work Summary Contents: 1. Self-introduction: I am the super

One year has passed quickly. During this year, with the care and help of the company's leaders, project directors and colleagues, my work ability and professional skills have been further improved. Summarize the achievements and gains in your work, so as to find out the shortcomings, so that you can better complete your job in the future.

In the past year, I worked as a civil engineering supervision engineer in the 4.2 project department of Peacock City Cambridgeshire. As a civil engineering supervision engineer, I feel a heavy responsibility, especially in the construction of high-rise buildings. They are all relatively high. Huaxia Real Estate Company requires high construction quality and a tripartite joint investigation. In view of this feature, under the guidance of the director of the project supervision department, a targeted and practical supervision plan has been formulated. From the foundation to the main body, each construction process strictly follows the supervision norms, drawing design and the current national construction quality acceptance norms to implement the supervision work, focusing on the quality control of building materials and construction techniques to ensure that the buildings Structural safety, review the material quality assurance sheet, re-inspection report, witness sampling, and inspection of the raw materials required for the project, and review the test results to ensure the quality of raw materials. Strictly check the binding quality of the steel bars, the thickness of the protective layer of the steel bars, and the pouring and vibration of the concrete during the construction of the main body of the high-rise, and promptly notify the project department of the construction unit orally or in writing for the problems found in the inspections and inspections during the construction process. Report problems to the director in a timely manner, and urge the construction unit to implement rectification and re-check inspections, and require supervisors to do a good job of side-by-side supervision of key parts, and do their best to do a good job in the quality of supervision and control before and during the event Control, do my due diligence to do the work I should do, and insist on strict supervision according to the drawings, specifications, and contracts to ensure the qualified acceptance of each sub-item and sub-project.

From the formwork erection of the main structure to the installation of steel bars and concrete pouring, the construction quality of each process is strictly checked. Whether the information is complete, check whether the quality assurance information is consistent with the batch number of the material, and at the same time carry out witness sampling and inspection of the relevant materials, all of which meet the design and specification requirements. Especially for the quality of steel bars and concrete, the construction party is required to carry out witness sampling and inspection according to the specifications, so as to ensure the engineering quality of the main structure.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, and put forward improvement suggestions for its deficiencies, and check the original certificates, test reports and other quality certification documents of incoming materials. And do a good job in advance control to ensure that project quality and safety accidents do not occur or rarely occur. For example: winter construction, low temperature, main body concrete pouring, secondary structure masonry masonry, the construction unit is required to provide a winter construction plan, prevent in advance, and avoid freezing damage.

Formulate quality pre-inspection measures for important engineering parts and sub-projects that are prone to quality problems. For example: in the construction of concrete pouring engineering in civil engineering, beams, slabs and columns are the key parts of the project, involving formwork, steel bar binding, concrete pouring, etc. Once negligent, it may cause engineering quality accidents. Once quality problems occur, the consequences will be serious. Therefore, in the construction of this part, strengthen monitoring, take side station supervision measures, strictly supervise the construction of each part, and check the factors that affect the construction quality in advance. It is proposed that the construction unit is required to prepare preventive measures and construction plans, thus ensuring the construction quality of beams, slabs and columns.

In the supervision work, the construction unit is required to follow the design content, design requirements, and construction acceptance specifications during the construction process to ensure the construction quality and no safety hazards. In the construction of each process, the construction unit is required to strictly implement the relevant national and local construction quality inspection systems, check and sign the relevant construction quality reports and hidden materials submitted by the construction unit in a timely manner, and calculate according to the relevant engineering quantities in the design documents and contract According to the regulations, the engineering quantity of the completed project declared by the contractor shall be carried out

Review, sign off and make records.

Supervision record is an indispensable part of project supervision. I am responsible for writing the supervision diary of 16# building, 26# building in Tanxiang Bay and 23# building, 24# building and 25# building in Ginkgo Bay, and recorded in detail the relevant conditions of the daily construction site , including side stations, inspections, witness sampling, parallel inspections, etc., and other related issues. During the supervision process, I actively coordinated the relationship between the various units so that they could cooperate with each other, support each other, and do a good job in the connection, so as to ensure the construction quality and schedule to be completed on schedule. In short, my experience is that as a supervisory engineer, we must not only have rich professional knowledge, but also have strong communication and coordination skills. Only with adaptability can we better serve the construction of the project and enable ourselves to develop better. The various pressures at work are also a rare challenge and test for me. I have learned a lot, learned a lot, and summed up a lot of experience and lessons, laying a solid foundation for better work in the future. Base.

In this new year my general perfects the inadequacy of oneself ceaselessly, sum up experience and lesson, strengthen the improvement of oneself professional skill level and business quality ceaselessly, enrich oneself ceaselessly. I firmly believe that with the vigorous help of the company's leaders and colleagues, I will be able to better complete my various tasks and make my due contribution to the company.

   Work summaryRecommended ppt template:

    Warm and fresh children's education work summary ppt template

    Blue minimalist monthly work summary plan ppt template

    Party and government organs party branch party building work summary report ppt template span>

    Cartoon fresh teaching and class work summary ppt template


Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/Supervision%20engineer%20work%20summary%20ppt%20model.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion