:Quarterly work summary ppt model of engineering department-PPT tutorial免费ppt模版下载-道格办公

Quarterly work summary ppt model of engineering department

Quarterly Work Summary of the Engineering Department Dear leaders and colleagues: Hello everyone! I am X from the engineering department, and I am very honored to present the 20xx quarterly work summary of our engineering department for you today. In the

In 20xx, under the correct leadership of the company and No. 8 companies, under the specific guidance of Party A's headquarters and supervision, our project will be "safety first" , prevention first, and comprehensive management" as the comprehensive policy, fully implement the "Safe Production Law", earnestly implement the safety documents issued by the company, the headquarters, and the supervision office, and focus on the implementation of safety measures and the construction of standardized construction sites. Complete safety management system and formulate standardized construction site implementation plan. The safety work of this year is summarized as follows now:

1. The realization of security goals.

0 cases of major safety liability accidents, 0 cases of major environmental pollution liability accidents, and 0 cases of serious occupational disease hazard accidents. The inspection safety pass rate of the construction projects that have started is 100%, the excellent rate is 85%, and the rectification rate of safety hazards is over 95%. The rate of three-level safety education for new employees is 100%, the rate of technical business management personnel with certificates is over 90%, the rate of special operations personnel with certificates is 100%, and the rate of small and medium-sized machinery operators with certificates is over 90%. Achieved this year's safety goals.

Second, the formulation and implementation of the safety management system

The project department has improved the safety management system, safety production responsibility system, safety inspection and hidden danger rectification system according to relevant requirements, and added migrant workers wage management system, A dynamic registration system for workers entering the site and a file system for workers.

3. Construction of standardized construction sites

Since entering the site, our project has always focused on the construction of standardized construction sites, and formulated a provincial-level civilized construction site plan according to the actual situation. It has passed the record of civilized construction site in Yan'an City.

(1) Civilized construction site

1. Our headquarters has convenient transportation, access to electricity, water, and telephone, realizing information-based office management.

2. The project manager office area, living area, and vehicle and machine parking areas are set up scientifically and reasonably, and the site and main roads in the area should be hardened The treatment and drainage facilities are perfect, the courtyard is properly greened, and the environment is beautiful and tidy. The public places of the project department are provided with a schematic diagram of functional zoning and guiding signs.

3. Office and living rooms: Office and living rooms are solid, practical, beautiful, heat-insulated and ventilated, and meet the requirements of bidding documents and construction management .

4. There are project manager's office, various business departments and archives rooms, meeting rooms, etc. in the office area, and name plates should be hung at the entrance of each department. Meeting room management diagrams are framed on the walls. Strictly implement the standardization requirements of the company's civilized construction site.

5. Necessary fire safety appliances are equipped in the office area and living area, a safety and sanitation management system is established, and maintenance and cleaning are carried out by special personnel.

6. Marking signs, public signs

Outside the construction site fence and material stacking site, the completed concrete components should be pasted with relevant signs.

Fourth, the signing of the safety target responsibility letter.

The project department signed a safety target responsibility letter with each construction team, construction team and team as part of the labor contract. The safety responsibilities of each construction team and each operation team are clarified to ensure that safety responsibilities are assigned to individuals.

The smooth development of safety work and the realization of safety goals this year are inseparable from the correct leadership of the company and the strong support of the project manager.

V. Safe work plan for 20xx

1. Safety management objectives

1. There were 0 major safety accidents, 0 major environmental pollution accidents, and 0 serious occupational disease hazard accidents.

2. Achieve the goal of six nos (no death, no serious injury, no collapse, no poisoning, no fire, no mechanical vehicle accidents).

3. Control the frequency of young injuries within 3‰.

4. The frequency of minor injuries per month should be controlled within 0.3‰.

5. The monthly inspection safety pass rate of the project should reach 100%, the good and good rate should reach 85%, and the safety hazard rectification rate should reach more than 90%.

6. The rate of three-level safety education for new employees is 100%.

7. More than 90% of technical and business management personnel hold certificates.

8. 100% of special operators have certificates, and more than 90% of small and medium-sized machinery operators have certificates.

Second, the focus of safety work.

The focus of safety work in 20xx is on standardized construction site construction and secondary structure construction. Taking the masonry team as the focus of standardized construction sites, starting from safe and civilized construction on site, we will achieve a unified image and standard for each work surface, and gradually establish standardized safety control procedures for each construction process, and finally form a standardized safety management system. Successfully passed the two-level civilized construction site acceptance work.

The year of 20xx is the year when all work areas will be fully started, safety and progress will be emphasized. Our project will continue to put safety work as the top priority. Ensure the realization of annual safety work goals.

   Work summaryRecommended ppt template:

    2021 business style marketing department work summary ppt template

    Ancient ink and wash business work summary ppt template

    Summary of water and hibiscus ink work ppt template

    ink plum blossom work summary ppt template

    Cartoon fresh teaching and class work summary ppt template

    Summary of Chinese Judicial Court Work

    Party and government organs party branch party building work summary report ppt template span>


Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/Quarterly%20work%20summary%20ppt%20model%20of%20engineering%20department.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion