Project cost staff work plan ppt model

Design standards and relevant laws and regulations, familiar with engineering cost accounting methods and procedures. Second, participate in the preliminary budget preparation of the project, including the calculation of the bill of quantities and the est

Combined with the completion of the work in the past year, I made a work plan for 20xx, and the goal is to make my cost work better.

1. The work content of the project cost clerk

The specific tasks of the construction cost clerk include:

First, master the design cost and construction cost budget management, that is, the second calculation management. Specifically, do a good job in the preparation of the second calculation and the comparison work, and prepare the increase or decrease of the budget for the received design changes, technical approval orders, materials, etc.

Second, the control of contract issuance, contract planning, drafting and initiation of the corresponding contract approval process for labor services and professional contracting, and evaluation of the performance of contract issuance.

Thirdly, claim management. If the owner fails to perform or fails to correctly perform the obligations stipulated in the contract and causes losses to the construction party, the construction party shall file a compensation claim with the owner and draft a claim document.

Fourth, project settlement. According to the completion data, the project project settlement statement is prepared to determine the final cost of the project.

At present, the salary price of cost clerks is about a certain yuan per month. It includes civil construction estimators and cost clerks, but now they have been collectively renamed as cost clerks.

2. Qualifications of cost clerks

Cost clerks need to go through training and assessment; after passing the assessment, they will be issued a certificate of employment. The certificate has a number, a steel seal, and its own seal, which contains the name and certificate number; the budget clerk can query the qualifications and certificate number through the Internet.

Cost officer certificate, also known as cost officer certificate, is now implemented in my country as a national construction engineering cost officer qualification examination system. Registered cost engineer is a national nature, and there are exams every year. It is not based on scores, but on the basis of the overall level of all examiners to determine the score line.

Cost clerk is a very good job. First of all, for us personally, it is not like construction workers and quality inspectors who go to the construction site all day long. In addition, its gold content is relatively high. If you don’t want to work in the original unit, you can change to another unit. It is also easy to find a job, which may be the reason why I chose to be a budgeter.

3. Responsibilities of Budget Officer

1. Be familiar with the laws and regulations of the country and the management regulations related to project cost, be proficient in the theoretical knowledge of this major, be familiar with engineering drawings, master project budget quotas and relevant policies and regulations, and lay the foundation for correct budget preparation and review.

2. Responsible for reviewing construction drawings, participating in joint review of drawings and technical disclosure, and adjusting budgets based on their records.

3. Assist the leaders in the project declaration, organization of bidding, approval before construction and acceptance after completion.

4. After the completion and acceptance of the project, the final account of the completed project shall be carried out in a timely manner, and reported to the director for signature and approval.

5. Participate in the procurement of engineering materials and equipment, be responsible for engineering material analysis, review material price differences, collect and master records of technical changes and material substitutions, and make cost calculations at any time to provide scientific basis for leadership decision-making.

6. Comprehensively grasp the terms of the construction contract, gain an in-depth understanding of the construction situation on site, and lay a solid foundation for the review of final accounts.

7. After the final account of the project, the final account of the factory should be sent to the audit department for auditing.

8. Complete the economic analysis of the project cost, and complete the archiving of the project final account data in time.

9. Assist in the preparation of capital construction plans and adjustment plans, and understand the implementation of capital construction plans.

    ppt template article recommendation:

    2021 cartoon giraffe teaching work plan ppt template

    2021 cartoon animal teaching work plan ppt template

    Cartoon school season education and teaching work plan ppt template

    Cartoon line style school season work plan ppt template

    2021 New Year red festive work plan ppt template


Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/Project%20cost%20staff%20work%20plan%20ppt%20model.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion