Engineer work summary ppt sample

The project is successfully completed. As an engineer, I also actively devoted myself to my work during this year, worked hard and made my own contribution to the development of the company. First of all, in the process of project implementation, I am ser

Time flies, Baiju is too late, we have gone through 20xx years of ups and downs. This year, under the leadership of the company's project leaders and with the concerted efforts of colleagues from various departments, the xx project in xx District smoothly passed one difficulty after another. All the project department worked together to overcome all difficulties. The precious phased victory also laid a good foundation for the next phase of work in the coming year. The work of the whole year is summarized as follows:

1. Diligence and pragmatism, pay close attention to on-site production work

The main work completed this year is earthwork, with a total of x ten thousand square meters of excavation, and x ten thousand square meters of filling and micro-terrain stacking. The construction site is divided into 4 areas ⅰ, ⅱ, Ⅲ, ⅳ, and the operation is divided into two stages. The whole earthwork is completed by three subcontractors. The main work of our department is the construction management and on-site quality inspection of the subcontractors. and multi-party coordination.

1. Check the number of subcontracted construction machinery and record the work site every day. From the date of commencement, the construction site has changed every day, and the daily work situation has been recorded in detail and truthfully by our department. And infer the work progress from the work efficiency for a period of time, and formulate a feasible work progress plan.

2. Implement and properly optimize the construction plan at the construction site. In order to transport the huge amount of earthwork in the X area, the transportation channel is a prerequisite, so the construction of a temporary road is a preparatory work that must be strictly completed. The temporary road is required to be wide enough and capable of carrying a full load of earth trucks and large-scale machinery and equipment. Since most of the original landforms on the site are fish ponds and the soil is soft, a large amount of brick slag needs to be replaced. The brick slag was procured from the outside, and all the members of the engineering department took turns working overnight shifts for nearly a month to complete the x square brick slag required for the entire temporary earthwork transportation road, and then dispatched machinery to level and compact it. A total of x meters of temporary roads were built throughout the project, which provided a reliable guarantee for the on-site earthwork transportation. On-site construction workers will participate in the formulation of the working parts and sequence of each subcontracted machinery, as well as the entry and exit routes of earth moving vehicles, and will be changed and optimized in a timely manner when construction conditions change. When starting to build the revetment in the lake area on the west side, nearly x million cubic meters of water could not be discharged in time due to heavy rain and groundwater seepage in areas I and II, which directly affected the excavation of the revetment. After the implementation of the drainage plan, our department conducted a month-long follow-up observation of the water level, which provided accurate data basis for the later progress formulation.

3. Check and monitor the construction status of subcontractors. The design and construction drawings are the basis for testing the on-site construction effect. The elevation of each part of the lake bottom and the location of detailed structures such as the lakeshore are clearly stated on the drawings, but deviations will inevitably occur in actual construction. At present, the quality of all aspects of the earthwork has reached the standards of supervision inspection and acceptance. This is the result of thousands of elevation and coordinate checks performed by our department on the site using instruments. Quality is guaranteed.

4. Safety is no small matter. On a huge construction site, with x machines working and x earth moving vehicles running back and forth, any detail problem may turn into a safety accident. As the construction staff in charge of the site, the string of safety awareness is always tight. Once a potential safety hazard is found on site, take photos and take samples immediately, notify the subcontractors to set up safety warning signs, and order rectification on time. The deeply rooted safety awareness has ensured that there are no major safety accidents in the entire project.

2. Rigorous and meticulous, providing a strong basis for the confirmation of engineering quantities

On-site construction is closely related to the economic benefits of the project. When the subcontractors transport the earthwork, the confirmation of the transportation distance and the amount of earthwork at the unloading yard directly affect the level of the overall cost. Each settlement of the earthwork is calculated by our staff using the total station to move all the excavated parts in turn, and then calculate it on the electronic drawing. The large and small soil unloading sites are also measured by our staff using the level and tape measure. All the rigorous and meticulous measurement work ensures the objectivity and fairness of the data, which is a reliable basis for earthwork settlement.

In addition to earthwork settlement, other costs on site should not be underestimated. For example, the cost of mechanical measures, due to the long time span of settlement of these costs, the amount of measures is very scattered, for this, our department has carried out statistics on the amount of measures by category to ensure that there is evidence to follow when checking with subcontractors. Brick slag is also a very large cost. When all the brick slag is transported to the site, our personnel will confirm the measurement, and then sign the front and back bills to ensure the authenticity and reliability of the brick slag measurement.

The confirmation of all engineering quantities has been rigorously notarized by our department, which not only ensures the economic benefits of the project department, but also creates value for customers.

3. Be reasonable and properly sort out the working relationship between all parties

As an on-site construction worker, it is particularly important to handle the relationship with all parties. In the daily inspection work of the supervisor, the staff of our department actively do the accompanying work, discuss the matter in the inspection process, neither humble nor overbearing, accept opinions with humility, solve problems in time, and ensure a harmonious relationship with the supervisor.

We also attach importance to the relationship with the subordinate subcontractors. In the face of subcontractors, they are not arrogant, fair and just, and urge them to ensure the quality of the project, and at the same time regulate their behavior and style, and work together to continuously advance the project.

Some villagers who have not moved out still live on the site. As the construction progresses, the crops and trees planted by the villagers will be destroyed, and many temporary houses and attachments in District xx need to be demolished. Although Party A has coordinated these compensation issues before, some villagers still encountered unreasonable obstructions during the on-site work, and even caused partial shutdowns in severe cases. As on-site managers, we were calm, patiently explained to the villagers, and sought coordination and consultation with multiple parties, so that the conflicts were resolved in a timely and effective manner. Up to now, the temporary housing of building x has been successfully demolished, ensuring the steady progress of the construction progress.

4. Be aggressive and continuously improve your working ability

Most of the members of the engineering department are young people with insufficient work experience, and the on-site experience needs to be further accumulated and enriched. However, this group of young people made full use of their advantages of energy and strong learning ability to make up for these shortcomings. They "charged up" in their spare time, constantly summed up their work, enhanced the tacit understanding of teamwork, and improved their ability to fight. ability.

5. Calmly reflect and pave the way for the work in the coming year

Although many good achievements have been made in engineering, there are still some defects and deficiencies. The torrential rain in July seriously affected the progress of the construction period. Although the lost construction period was barely made up in the later schedule, the lack of foresight made us pay the price.

Most of the time, the engineering department is like a sharp knife on the battlefield, standing at the forefront of the scene at all times. No matter how difficult the environment is, they are brave to show their swords, willing to give, and silently dedicate their youth and sweat. I believe that as time goes by, our engineering department will definitely be able to exert a stronger combat effectiveness, win the overall victory of the entire project in the coming 20xx, and compose the most brilliant movement of our engineering department.

   Work summaryRecommended ppt template:

    Warm and fresh children's education work summary ppt template

    blue slash business background monthly work summary and next month plan ppt

    Abstract city monthly work summary ppt template

    Red simple microsome work summary ppt template

    Blue minimalist monthly work summary plan ppt template

    Party and government organs party branch party building work summary report ppt template span>


Articles are uploaded by users and are for non-commercial browsing only. Posted by: Lomu, please indicate the source: https://www.daogebangong.com/en/articles/detail/Engineer%20work%20summary%20ppt%20sample.html

Like (810)
Reward 支付宝扫一扫 支付宝扫一扫
single-end

Related Suggestion